#1 — Inspections
Total: 9 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 04/24/2008 | 04/24/2008 | East Kentucky Excavation, Inc. | 5.00 | 1 |
| 12/05/2007 | 12/06/2007 | East Kentucky Excavation, Inc. | 12.00 | 1 |
| 08/29/2007 | 08/30/2007 | East Kentucky Excavation, Inc. | 2.25 | 1 |
| 03/13/2007 | 03/13/2007 | East Kentucky Excavation, Inc. | 3.50 | 1 |
| 04/03/2006 | 04/13/2006 | East Kentucky Excavation, Inc. | 19.50 | 1 |
| 10/25/2005 | 12/01/2005 | East Kentucky Excavation, Inc. | 19.50 | 1 |
| 04/06/2005 | 06/30/2005 | East Kentucky Excavation, Inc. | 120.00 | 2 |
| 03/30/2005 | 03/30/2005 | East Kentucky Excavation, Inc. | 12.00 | 1 |
| 03/15/2005 | 03/31/2005 | East Kentucky Excavation, Inc. | 31.00 | 1 |