#1712 2011 TESAB CRUSHER — Inspections
Total: 19 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 03/20/2025 | 03/20/2025 | TROTTER CONSTRUCTION INC | 9.00 | 1 |
| 04/23/2024 | 04/23/2024 | TROTTER CONSTRUCTION INC | 11.00 | 1 |
| 05/08/2023 | 05/09/2023 | TROTTER CONSTRUCTION INC | 9.50 | 1 |
| 06/26/2022 | 06/27/2022 | TROTTER CONSTRUCTION INC | 4.75 | 1 |
| 09/02/2020 | 09/02/2020 | TROTTER CONSTRUCTION INC | 0.50 | 1 |
| 08/19/2020 | 08/19/2020 | TROTTER CONSTRUCTION INC | 7.50 | 1 |
| 08/15/2019 | 08/15/2019 | TROTTER CONSTRUCTION INC | 10.00 | 1 |
| 03/28/2018 | 03/28/2018 | TROTTER CONSTRUCTION INC | 19.50 | 1 |
| 09/24/2014 | 09/24/2014 | TROTTER CONSTRUCTION INC | 3.00 | 1 |
| 12/10/2013 | 12/10/2013 | TROTTER CONSTRUCTION INC | 17.00 | 1 |
| 08/22/2013 | 08/22/2013 | TROTTER CONSTRUCTION INC | 10.25 | 1 |
| 01/08/2013 | 01/08/2013 | TROTTER CONSTRUCTION INC | 7.50 | 1 |
| 12/18/2012 | 12/20/2012 | TROTTER CONSTRUCTION INC | 22.00 | 1 |
| 01/19/2012 | 01/19/2012 | TROTTER CONSTRUCTION INC | 10.00 | 1 |
| 02/28/2011 | 02/28/2011 | TROTTER CONSTRUCTION INC | 2.50 | 1 |
| 02/24/2011 | 02/24/2011 | TROTTER CONSTRUCTION INC | 4.00 | 1 |
| 02/02/2010 | 02/03/2010 | TROTTER CONSTRUCTION INC | 28.50 | 1 |
| 09/10/2009 | 09/10/2009 | TROTTER CONSTRUCTION INC | 14.75 | 1 |
| 05/20/2009 | 05/20/2009 | TROTTER CONSTRUCTION INC | 4.00 | 1 |