1840WP Portable — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
10/09/2024 10/15/2024 Crow River Construction 15.75 1
06/25/2024 06/26/2024 Crow River Construction 11.75 1
05/22/2024 05/22/2024 Crow River Construction 0.50 1
06/08/2023 06/09/2023 Crow River Construction 14.25 1
08/09/2022 08/09/2022 Crow River Construction 5.00 1
06/13/2022 06/14/2022 Crow River Construction 9.75 1