#3 Portable Screener — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 11/12/2025 | 11/13/2025 | Chard Grading and Excavation L... | 11.75 | 1 |
| 07/24/2025 | 07/24/2025 | Chard Grading and Excavation L... | 0.25 | 1 |
| 06/05/2024 | 06/05/2024 | Chard Grading and Excavation L... | 6.25 | 1 |
| 07/12/2023 | 07/12/2023 | Chard Grading and Excavation L... | 14.00 | 1 |