380 FINLEY SCREENER — Inspections

Total: 4 inspections

Begin End Operator Hours Inspectors
09/11/2001 09/11/2001 International Material Inc 21.00 1
09/04/2001 09/04/2001 International Material Inc 7.00 1
08/30/2001 08/30/2001 International Material Inc 6.00 1
02/06/2001 02/06/2001 International Material Inc 6.00 1