79-0117 KPI-JCI Tracked Jaw Crusher — Inspections

Total: 5 inspections

Begin End Operator Hours Inspectors
09/15/2025 09/16/2025 R. G. Huston Co., Inc. 5.50 1
08/13/2025 08/13/2025 R. G. Huston Co., Inc. 2.00 1
12/19/2023 12/20/2023 R. G. Huston Co., Inc. 5.75 1
10/31/2022 11/02/2022 R. G. Huston Co., Inc. 11.75 1
03/10/2022 03/10/2022 R. G. Huston Co., Inc. 11.00 1