Aggregate Processing Plant — Inspections

Total: 5 inspections

Begin End Operator Hours Inspectors
10/08/2025 10/08/2025 Smith's Materials LLC 12.50 1
10/08/2024 10/08/2024 Smith's Materials LLC 7.00 1
05/22/2024 05/22/2024 Smith's Materials LLC 1.50 1
10/31/2023 11/06/2023 Smith's Materials LLC 12.00 1
06/26/2023 06/27/2023 Smith's Materials LLC 7.00 1