Aladdin Pit — Inspections

Total: 5 inspections

Begin End Operator Hours Inspectors
07/11/2006 07/17/2006 Croell, Inc. 25.00 1
06/13/2006 06/13/2006 Croell, Inc. 2.50 1
01/10/2006 01/10/2006 Croell, Inc. 2.50 1
09/21/2004 09/23/2004 Croell, Inc. 21.00 1
07/30/2004 07/30/2004 Croell, Inc. 7.00 1