Alamo1 Materials Zavala Plant — Inspections
Total: 7 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 05/13/2015 | 05/15/2015 | Alamo 1 Materials | 4.50 | 1 |
| 10/07/2014 | 10/16/2014 | Alamo 1 Materials | 12.00 | 1 |
| 04/30/2014 | 04/30/2014 | Alamo 1 Materials | 11.75 | 1 |
| 12/16/2013 | 12/18/2013 | Alamo 1 Materials | 11.25 | 1 |
| 05/21/2013 | 05/22/2013 | Alamo 1 Materials | 14.00 | 1 |
| 04/29/2013 | 04/30/2013 | Alamo 1 Materials | 8.00 | 1 |
| 09/25/2012 | 10/04/2012 | Alamo 1 Materials | 32.50 | 1 |