Amrize Portland Plant — Inspections

Total: 153 inspections

Begin End Operator Hours Inspectors
07/26/2000 07/26/2000 Holnam Inc 8.00 1
07/25/2000 07/26/2000 Holnam Inc 24.00 1
05/03/2000 08/03/2000 Holnam Inc 197.00 1