Anaktuvuk Pass Gravel Pit — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
08/25/2025 08/29/2025 ASRC Earthworks, LLC. 6.25 1
02/21/2025 02/21/2025 ASRC Earthworks, LLC. 1.00 1
08/29/2024 08/30/2024 ASRC Earthworks, LLC. 5.50 1
08/30/2023 08/30/2023 ASRC Civil Construction, LLC. 1.00 1
08/29/2023 08/31/2023 ASRC Civil Construction, LLC. 30.50 1
08/29/2015 09/02/2015 ASRC Civil Construction, LLC. 10.00 1