Appalachia Remining #2 — Inspections
Total: 5 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 03/19/2007 | 03/19/2007 | Energy Technologies, Inc. | 0.50 | 1 |
| 05/02/2006 | 06/06/2006 | Energy Technologies, Inc. | 4.00 | 1 |
| 10/13/2005 | 11/30/2005 | Energy Technologies, Inc. | 6.00 | 1 |
| 10/05/2005 | 10/05/2005 | Energy Technologies, Inc. | 5.00 | 1 |
| 09/08/2005 | 09/30/2005 | Energy Technologies, Inc. | 15.00 | 1 |