Arlian Excavating — Inspections

Total: 12 inspections

Begin End Operator Hours Inspectors
03/30/2011 03/31/2011 Arlian Excavating 13.00 1
08/03/2010 08/03/2010 Arlian Excavating 3.75 1
07/30/2009 07/30/2009 Arlian Excavating 10.00 1
08/06/2008 08/07/2008 Arlian Excavating 6.50 1
07/17/2007 07/18/2007 Arlian Excavating 5.00 1
07/06/2006 07/06/2006 Arlian Excavating 10.50 1
09/08/2005 09/08/2005 Arlian Excavating 8.00 1
03/03/2004 03/03/2004 Arlian Excavating 6.00 1
02/25/2004 02/25/2004 Arlian Excavating 10.00 2
06/18/2003 06/18/2003 Arlian Excavating 6.00 1
03/14/2002 03/14/2002 Arlian Excavating 8.00 1
08/28/2001 08/28/2001 Arlian Excavating 8.00 2