ARP Portable Wash Plant — Inspections

Total: 7 inspections

Begin End Operator Hours Inspectors
04/23/2019 04/25/2019 American Rock Products 15.00 1
08/27/2018 08/29/2018 American Rock Products 26.00 1
01/08/2018 01/11/2018 American Rock Products 22.50 1
11/08/2016 11/14/2016 Columbia Ready-Mix, Inc. 15.50 1
02/22/2016 02/25/2016 Columbia Ready-Mix, Inc. 16.00 1
06/01/2015 06/03/2015 Columbia Ready-Mix, Inc. 19.00 1
07/15/2014 07/17/2014 Columbia Ready-Mix, Inc. 29.00 1