ARP Prtbl Crusher WP/Kolberg — Inspections

Total: 5 inspections

Begin End Operator Hours Inspectors
08/13/2018 08/16/2018 Central Washington Concrete 18.00 1
08/29/2017 08/30/2017 Central Washington Concrete 12.75 1
04/11/2016 04/15/2016 Central Washington Concrete 12.50 1
07/08/2008 07/08/2008 Central Washington Concrete 4.00 1
09/18/2007 09/21/2007 Central Washington Concrete 21.00 1