ARP Prtbl Crusher WP/Kolberg — Inspections
Total: 5 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 08/13/2018 | 08/16/2018 | Central Washington Concrete | 18.00 | 1 |
| 08/29/2017 | 08/30/2017 | Central Washington Concrete | 12.75 | 1 |
| 04/11/2016 | 04/15/2016 | Central Washington Concrete | 12.50 | 1 |
| 07/08/2008 | 07/08/2008 | Central Washington Concrete | 4.00 | 1 |
| 09/18/2007 | 09/21/2007 | Central Washington Concrete | 21.00 | 1 |