Astec Cone Plant — Inspections

Total: 5 inspections

Begin End Operator Hours Inspectors
09/17/2025 09/22/2025 Quirion Inc 5.00 1
07/07/2025 07/08/2025 Quirion Inc 9.75 1
05/13/2024 05/14/2024 Quirion Inc 5.50 1
12/21/2022 12/22/2022 Quirion Inc 11.75 1
10/05/2021 10/07/2021 Quirion Inc 10.50 1