Aztec Sand & Gravel — Inspections

Total: 12 inspections

Begin End Operator Hours Inspectors
07/23/2014 07/23/2014 Barrett Asphalt Corp. 9.50 1
02/26/2014 02/27/2014 Barrett Asphalt Corp. 1.00 1
08/14/2013 08/15/2013 Barrett Asphalt Corp. 13.00 1
06/10/2013 06/10/2013 Barrett Asphalt Corp. 1.00 1
03/26/2013 03/26/2013 Barrett Asphalt Corp. 8.00 1
02/12/2013 02/13/2013 Barrett Asphalt Corp. 7.00 1
01/09/2013 02/01/2013 Barrett Asphalt Corp. 125.25 1
07/30/2002 07/30/2002 Barrett Asphalt Corp. 6.00 1
04/12/2001 04/18/2001 Barrett Asphalt Corp. 9.00 1
04/12/2001 04/12/2001 Barrett Asphalt Corp. 21.00 1
06/26/2000 06/26/2000 Barrett Asphalt Corp. 7.00 1
06/26/2000 06/26/2000 Barrett Asphalt Corp. 2.00 1