Azusa Quarry — Inspections

Total: 9 inspections

Begin End Operator Hours Inspectors
02/18/2020 02/27/2020 Greenleaf Engineering 2.75 1
08/28/2019 08/28/2019 Greenleaf Engineering 4.50 1
05/08/2019 05/08/2019 Greenleaf Engineering 1.50 1
03/26/2019 03/26/2019 Greenleaf Engineering 4.00 1
12/31/2018 12/31/2018 Greenleaf Engineering 9.50 2
12/17/2018 12/17/2018 Greenleaf Engineering 4.50 1
11/28/2018 11/28/2018 Greenleaf Engineering 3.00 1
11/07/2018 11/07/2018 Greenleaf Engineering 8.00 1
09/13/2018 10/18/2018 Greenleaf Engineering 38.00 1