Baca Road — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 01/14/2026 | 01/14/2026 | Travis Materials East Central... | 2.75 | 1 |
| 01/05/2026 | 01/07/2026 | Travis Materials East Central... | 35.50 | 1 |
| 05/14/2025 | 05/19/2025 | Travis Materials East Central... | 14.50 | 1 |
| 04/22/2025 | 04/28/2025 | Travis Materials East Central... | 29.00 | 1 |