Back Creek Surface Mine — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
05/05/2015 05/07/2015 Kopper Glo Mining, LLC 11.00 1
11/17/2014 12/30/2014 Kopper Glo Mining, LLC 63.50 3
09/12/2014 09/12/2014 Kopper Glo Mining, LLC 2.50 1
06/24/2014 06/24/2014 Kopper Glo Mining, LLC 4.75 1
04/30/2014 08/07/2014 Kopper Glo Mining, LLC 116.50 7
03/05/2014 03/05/2014 Kopper Glo Mining, LLC 7.00 2