Bannack Mine — Inspections
Total: 8 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 06/14/2012 | 06/14/2012 | McDonald Excavation Inc | 7.00 | 1 |
| 10/20/2011 | 10/20/2011 | McDonald Excavation Inc | 4.00 | 1 |
| 09/28/2011 | 09/28/2011 | McDonald Excavation Inc | 0.75 | 1 |
| 06/29/2011 | 06/29/2011 | McDonald Excavation Inc | 2.50 | 1 |
| 04/06/2011 | 04/06/2011 | McDonald Excavation Inc | 3.00 | 1 |
| 10/21/2010 | 10/22/2010 | McDonald Excavation Inc | 5.00 | 1 |
| 08/26/2010 | 08/31/2010 | McDonald Excavation Inc | 28.00 | 1 |
| 09/29/2004 | 09/29/2004 | McDonald Excavation Inc | 5.00 | 1 |