BARRETT WESTVILLE PLANT — Inspections

Total: 3 inspections

Begin End Operator Hours Inspectors
07/31/2002 07/31/2002 Barrett Paving Materials Inc 4.00 1
10/18/2001 10/18/2001 Barrett Paving Materials Inc 7.00 1
08/17/2000 08/17/2000 Barrett Paving Materials Inc 4.00 1