Beaver Mining No 1 — Inspections

Total: 8 inspections

Begin End Operator Hours Inspectors
04/02/2013 04/02/2013 Beaver Mining Inc 1.50 1
03/19/2010 03/19/2010 Beaver Mining Inc 5.50 2
04/07/2009 06/02/2009 Beaver Mining Inc 15.50 2
11/17/2008 11/25/2008 Beaver Mining Inc 10.50 1
05/27/2008 06/05/2008 Beaver Mining Inc 52.75 2
02/26/2008 03/04/2008 Beaver Mining Inc 2.50 1
11/20/2007 02/21/2008 Beaver Mining Inc 48.50 2
06/11/2007 07/25/2007 Beaver Mining Inc 61.50 3