Bedrock Plant — Inspections

Total: 23 inspections

Begin End Operator Hours Inspectors
12/12/2013 12/12/2013 Heflin Construction Inc 2.25 1
11/13/2013 11/13/2013 Heflin Construction Inc 4.00 1
04/03/2013 04/03/2013 Heflin Construction Inc 4.00 1
03/07/2012 03/07/2012 Heflin Construction Inc 5.00 1
03/10/2011 03/11/2011 Heflin Construction Inc 9.00 1
03/29/2010 03/31/2010 Heflin Construction Inc 19.00 1
08/10/2009 08/10/2009 Heflin Construction Inc 4.00 1
01/27/2009 01/27/2009 Heflin Construction Inc 4.00 1
07/08/2008 07/08/2008 Heflin Construction Inc 9.00 1
02/19/2008 02/20/2008 Heflin Construction Inc 14.00 1
01/30/2008 01/30/2008 Heflin Construction Inc 8.50 1
07/25/2007 07/25/2007 Heflin Construction Inc 4.00 1
08/08/2006 08/08/2006 Heflin Construction Inc 6.00 1
07/17/2006 07/17/2006 Heflin Construction Inc 4.00 1
06/20/2006 06/20/2006 Heflin Construction Inc 1.00 1
03/27/2006 03/27/2006 Heflin Construction Inc 8.00 1
03/06/2006 03/06/2006 Heflin Construction Inc 3.00 1
07/26/2005 07/27/2005 Heflin Construction Inc 12.00 1
06/23/2005 06/23/2005 Heflin Construction Inc 4.00 1
05/23/2005 05/23/2005 Heflin Construction Inc 0.00 0
05/23/2005 05/23/2005 Heflin Construction Inc 6.00 1
05/23/2005 05/23/2005 Heflin Construction Inc 0.00 0
05/17/2005 05/19/2005 Heflin Construction Inc 47.50 1