Beech Fork Gob Pile Project — Inspections
Total: 5 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 10/02/2002 | 10/04/2002 | Double M Mining L.C. | 5.00 | 1 |
| 09/18/2002 | 09/25/2002 | Double M Mining L.C. | 13.00 | 1 |
| 05/01/2002 | 06/05/2002 | Double M Mining L.C. | 13.25 | 1 |
| 04/24/2002 | 04/29/2002 | Double M Mining L.C. | 14.00 | 1 |
| 03/26/2002 | 03/26/2002 | Double M Mining L.C. | 2.00 | 1 |