BELLAIRE STONE — Inspections

Total: 23 inspections

Begin End Operator Hours Inspectors
10/15/2009 10/15/2009 Sidwell Materials Inc 6.50 1
04/08/2009 04/08/2009 Sidwell Materials Inc 5.50 1
09/15/2008 09/15/2008 Sidwell Materials Inc 5.50 1
08/19/2008 08/19/2008 Sidwell Materials Inc 4.50 1
11/26/2007 11/26/2007 Sidwell Materials Inc 10.00 1
09/19/2007 09/19/2007 Sidwell Materials Inc 9.00 1
09/11/2006 09/13/2006 Sidwell Materials Inc 15.25 1
01/23/2006 01/25/2006 Sidwell Materials Inc 21.00 1
08/02/2005 08/03/2005 Sidwell Materials Inc 20.50 1
12/21/2004 12/21/2004 Sidwell Materials Inc 11.00 1
06/15/2004 06/17/2004 Sidwell Materials Inc 17.00 1
10/29/2003 10/30/2003 Sidwell Materials Inc 13.00 1
08/23/2003 08/23/2003 Sidwell Materials Inc 1.00 1
06/24/2003 06/24/2003 Sidwell Materials Inc 10.00 1
02/05/2003 02/10/2003 Sidwell Materials Inc 4.00 1
02/04/2003 02/05/2003 Sidwell Materials Inc 14.00 1
10/24/2002 10/24/2002 Sidwell Materials Inc 2.00 1
07/31/2002 08/01/2002 Sidwell Materials Inc 19.00 1
01/02/2002 01/03/2002 Sidwell Materials Inc 20.00 1
09/07/2001 09/07/2001 Sidwell Materials Inc 5.00 1
08/28/2001 08/29/2001 Sidwell Materials Inc 14.00 1
04/16/2001 04/17/2001 Sidwell Materials Inc 36.00 2
09/19/2000 09/21/2000 Sidwell Materials Inc 40.00 2