Bent Mountain Surface Mine #2 — Inspections

Total: 172 inspections

Begin End Operator Hours Inspectors
04/12/2001 09/28/2001 Lodestar Energy, Inc 124.50 4
04/02/2001 04/30/2001 Lodestar Energy, Inc 5.25 1
04/02/2001 04/30/2001 Lodestar Energy, Inc 11.75 1
04/02/2001 05/07/2001 Lodestar Energy, Inc 9.50 1
03/09/2001 03/09/2001 Lodestar Energy, Inc 2.50 1
02/06/2001 02/13/2001 Lodestar Energy, Inc 25.50 1
12/11/2000 01/09/2001 Lodestar Energy, Inc 14.75 1
12/11/2000 01/09/2001 Lodestar Energy, Inc 14.50 1
10/20/2000 03/28/2001 Lodestar Energy, Inc 91.50 4
10/16/2000 10/23/2000 Lodestar Energy, Inc 14.00 1
09/07/2000 09/07/2000 Lodestar Energy, Inc 8.00 2
09/06/2000 09/12/2000 Lodestar Energy, Inc 14.00 3
08/25/2000 09/01/2000 Lodestar Energy, Inc 29.00 2
06/20/2000 07/26/2000 Lodestar Energy, Inc 29.00 1
06/01/2000 09/30/2000 Lodestar Energy, Inc 175.50 3
05/24/2000 05/24/2000 Lodestar Energy, Inc 4.00 1
05/16/2000 05/16/2000 Lodestar Energy, Inc 3.00 1
05/10/2000 05/10/2000 Lodestar Energy, Inc 8.00 1
04/17/2000 04/17/2000 Lodestar Energy, Inc 8.00 1
04/03/2000 04/07/2000 Lodestar Energy, Inc 33.00 1
03/01/2000 03/22/2000 Lodestar Energy, Inc 28.75 2
02/29/2000 03/22/2000 Lodestar Energy, Inc 37.75 3