BHP Open Pit — Inspections

Total: 4 inspections

Begin End Operator Hours Inspectors
01/15/2002 01/15/2002 BHP Copper 8.00 1
03/12/2001 03/19/2001 BHP Copper 38.00 2
06/27/2000 06/28/2000 BHP Copper 13.00 1
05/09/2000 05/09/2000 BHP Copper 4.00 1