Big Ridge Mine Prep Plant/Maint Shop — Inspections

Total: 27 inspections

Begin End Operator Hours Inspectors
08/12/2003 08/12/2003 Big Ridge Inc 2.00 1
07/15/2003 07/15/2003 Big Ridge Inc 8.00 1
03/03/2003 03/03/2003 Big Ridge Inc 10.00 1
01/15/2003 01/15/2003 Big Ridge Inc 8.00 1
10/29/2002 10/29/2002 Big Ridge Inc 8.00 1
09/30/2002 09/30/2002 Big Ridge Inc 4.75 1
06/11/2002 09/30/2002 Big Ridge Inc 17.25 1
04/22/2002 04/22/2002 Big Ridge Inc 8.00 1
12/11/2001 12/20/2001 Big Ridge Inc 28.00 1
11/15/2001 11/15/2001 Big Ridge Inc 8.50 1
08/17/2001 08/30/2001 Big Ridge Inc 12.50 1
07/10/2001 07/10/2001 7.00 1
07/03/2001 07/10/2001 33.00 2
05/02/2001 05/02/2001 8.00 1
04/11/2001 04/11/2001 10.00 1
02/05/2001 03/12/2001 10.00 1
02/01/2001 02/01/2001 8.00 1
11/14/2000 11/17/2000 16.00 1
11/09/2000 12/07/2000 42.50 1
09/12/2000 09/14/2000 27.00 1
08/24/2000 09/05/2000 17.00 1
06/27/2000 06/27/2000 8.00 1
03/29/2000 03/29/2000 3.00 1
03/27/2000 03/27/2000 7.00 1
03/21/2000 08/08/2000 326.50 4
03/21/2000 03/29/2000 23.50 1
02/24/2000 03/01/2000 27.00 1