Key Takeaway

Birch River Energy Plant No 1 is a temporarily idled facility mine producing Coal, located in Cowen, Webster County, WV. It has 281 violations on record (102 S&S) and $144K in proposed penalties. Operated by Birch River Energy, LLC.

Birch River Energy Plant No 1

Temporarily Idled Facility Coal

Operator: Birch River Energy, LLC

Controller: Pristine Clean Energy LLC

Location: Cowen, Webster County, WV

281
Violations
102
S&S Violations
54
Accidents
$144K
Penalties

Recent Violations

View all 281 →
Date Section S&S Negligence Penalty
09/14/2023 77.904 Non-S&S ModNegligence $143
09/14/2023 77.1104 Non-S&S ModNegligence $143
04/17/2023 71.206(a) Non-S&S LowNegligence $143
01/04/2023 77.904 Non-S&S ModNegligence $143
07/14/2022 77.1606(c) Non-S&S LowNegligence $133
07/14/2022 77.505 Non-S&S LowNegligence $133
02/09/2022 77.1606(c) Non-S&S LowNegligence $133
02/07/2022 77.1606(c) Non-S&S LowNegligence $133
02/07/2022 77.1605(b) Non-S&S LowNegligence $133
02/07/2022 77.1605(b) Non-S&S LowNegligence $133
02/07/2022 77.1104 Non-S&S LowNegligence $133
01/06/2020 77.1606(c) Non-S&S LowNegligence $123
01/06/2020 77.1605(b) Non-S&S LowNegligence $123
01/02/2020 77.1606(c) Non-S&S LowNegligence $123
01/02/2020 77.1104 Non-S&S LowNegligence $123
12/17/2019 77.1104 Non-S&S ModNegligence $123
07/24/2019 77.1606(c) Non-S&S LowNegligence $121
07/24/2019 77.1104 S&S ModNegligence $168
07/23/2019 77.1606(c) Non-S&S LowNegligence $121
07/22/2019 77.1606(c) Non-S&S LowNegligence $121

Accidents & Injuries

View all 54 →
Date Classification Injury Days Lost
04/24/2023 HANDLING OF MATERIALS NO DYS AWY FRM WRK,NO RSTR ACT None
06/14/2019 MACHINERY NO DYS AWY FRM WRK,NO RSTR ACT None
07/08/2016 DUST DISEASE OF LUNGS OCCUPATNAL ILLNESS NOT DEG 1-6 None
05/03/2016 HANDLING OF MATERIALS NO DYS AWY FRM WRK,NO RSTR ACT None
02/01/2016 DUST DISEASE OF LUNGS OCCUPATNAL ILLNESS NOT DEG 1-6 None
01/25/2016 FIRE ACCIDENT ONLY None
01/14/2016 MACHINERY DAYS AWAY FROM WORK ONLY 2d lost
10/24/2015 HANDLING OF MATERIALS NO DYS AWY FRM WRK,NO RSTR ACT None
12/04/2014 SLIP OR FALL OF PERSON DAYS AWAY FROM WORK ONLY 29d lost
06/03/2014 OTHER INJURIES DUE TO NATURAL CAUSES 1d lost

Inspections

View all 110 →
Begin End Hours Inspectors
10/23/2025 10/23/2025 5.50 1
04/01/2025 04/01/2025 3.50 1
11/04/2024 11/04/2024 3.00 1
05/14/2024 05/14/2024 3.50 1
02/26/2024 02/26/2024 3.25 1
08/08/2023 09/26/2023 90.25 4
05/17/2023 05/17/2023 8.00 1
04/17/2023 04/17/2023 1.00 1
12/22/2022 02/13/2023 68.00 2
07/07/2022 09/21/2022 90.75 2

Mine Details

MSHA Mine ID4606045
Mine TypeFacility
StatusTemporarily Idled
CommodityCoal
SIC DescriptionCoal (Bituminous)
Days/Week7.0
Hours/Shift0.0
Coordinates38.5188890, -80.6352780
Nearest TownCowen

Frequently Asked Questions

How many MSHA violations does Birch River Energy Plant No 1 have?

Birch River Energy Plant No 1 has 281 MSHA violations on record, of which 102 are classified as Significant & Substantial (S&S). Total proposed penalties amount to $144K.

What type of mine is Birch River Energy Plant No 1?

Birch River Energy Plant No 1 is a Facility mine producing Coal, located in Cowen, Webster County, WV. It currently has 0 employees.

Has anyone been injured or killed at Birch River Energy Plant No 1?

According to MSHA records, Birch River Energy Plant No 1 has 54 reported accident/injury records and 1 fatalities on file.

Who operates Birch River Energy Plant No 1?

Birch River Energy Plant No 1 is operated by Birch River Energy, LLC and controlled by Pristine Clean Energy LLC. MSHA Mine ID: 4606045.