Black Canyon Mica Project — Inspections

Total: 7 inspections

Begin End Operator Hours Inspectors
07/02/2002 07/02/2002 Azco Mica Inc 5.00 1
06/27/2002 06/27/2002 Azco Mica Inc 11.00 1
11/13/2000 11/13/2000 Azco Mica Inc 5.00 1
10/11/2000 10/12/2000 Azco Mica Inc 3.00 1
10/11/2000 10/13/2000 Azco Mica Inc 17.00 3
10/03/2000 10/03/2000 Azco Mica Inc 6.00 1
07/18/2000 07/19/2000 Azco Mica Inc 13.00 1