Blackstone — Inspections

Total: 8 inspections

Begin End Operator Hours Inspectors
07/16/2003 07/16/2003 Blackstone Mining 4.00 1
07/15/2003 07/16/2003 Blackstone Mining 20.50 1
02/05/2003 02/12/2003 Blackstone Mining 21.50 1
07/30/2002 07/30/2002 Blackstone Mining 3.50 1
07/30/2002 08/12/2002 Blackstone Mining 16.25 1
02/04/2002 02/12/2002 Blackstone Mining 15.75 1
09/19/2001 09/19/2001 Blackstone Mining 7.00 1
08/28/2001 08/28/2001 Blackstone Mining 1.50 1