Bloomfield Processing Facility — Inspections

Total: 7 inspections

Begin End Operator Hours Inspectors
02/02/2026 02/03/2026 B8D, LLC 21.00 1
09/29/2025 10/01/2025 B8D, LLC 19.00 1
09/26/2025 11/20/2025 B8D, LLC 23.00 1
07/28/2025 07/30/2025 B8D, LLC 21.50 3
07/14/2025 07/15/2025 B8D, LLC 7.00 1
04/30/2025 05/01/2025 B8D, LLC 9.00 1
03/05/2025 03/06/2025 B8D, LLC 9.00 1