Blue Creek Processing — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
11/23/2025 11/24/2025 Warrior Met Coal BC, LLC 0.00 0
11/14/2025 01/30/2026 Warrior Met Coal BC, LLC 66.00 3
07/08/2025 08/07/2025 Warrior Met Coal BC, LLC 78.00 3
05/28/2025 05/29/2025 Warrior Met Coal BC, LLC 1.50 1
03/11/2025 03/11/2025 Warrior Met Coal BC, LLC 4.00 1
02/24/2025 03/03/2025 Warrior Met Coal BC, LLC 52.75 2