Blue Lake Mine — Inspections

Total: 30 inspections

Begin End Operator Hours Inspectors
11/02/2010 11/03/2010 Draughn Sand & Gravel Inc 16.50 1
04/13/2010 04/14/2010 Draughn Sand & Gravel Inc 15.00 1
11/30/2009 12/02/2009 Draughn Sand & Gravel Inc 26.00 1
05/05/2009 05/08/2009 Draughn Sand & Gravel Inc 6.00 1
04/07/2009 04/08/2009 Draughn Sand & Gravel Inc 8.75 1
10/21/2008 10/21/2008 Draughn Sand & Gravel Inc 4.75 1
04/18/2008 04/18/2008 Draughn Sand & Gravel Inc 2.00 1
04/15/2008 04/16/2008 Draughn Sand & Gravel Inc 16.50 1
01/30/2008 01/30/2008 Draughn Sand & Gravel Inc 2.75 1
01/29/2008 01/29/2008 Draughn Sand & Gravel Inc 5.50 1
01/03/2008 01/03/2008 Draughn Sand & Gravel Inc 1.50 1
06/19/2007 06/20/2007 Draughn Sand & Gravel Inc 19.00 1
07/19/2006 07/24/2006 Draughn Sand & Gravel Inc 31.00 1
03/07/2006 03/07/2006 Draughn Sand & Gravel Inc 4.50 1
12/07/2004 12/07/2004 Draughn Sand & Gravel Inc 13.00 1
08/25/2004 08/25/2004 Draughn Sand & Gravel Inc 13.00 1
07/07/2004 07/07/2004 Draughn Sand & Gravel Inc 10.00 1
06/30/2004 07/01/2004 Draughn Sand & Gravel Inc 16.00 1
06/08/2004 06/09/2004 Draughn Sand & Gravel Inc 26.00 1
08/13/2003 08/13/2003 Draughn Sand & Gravel Inc 10.00 1
06/11/2003 06/11/2003 Draughn Sand & Gravel Inc 8.00 1
03/10/2003 03/12/2003 Draughn Sand & Gravel Inc 3.00 1
11/06/2002 11/07/2002 Draughn Sand & Gravel Inc 10.00 1
10/23/2002 10/23/2002 Draughn Sand & Gravel Inc 4.00 1
09/24/2002 09/24/2002 Draughn Sand & Gravel Inc 12.00 1
05/15/2002 05/15/2002 Draughn Sand & Gravel Inc 5.00 1
05/07/2002 05/07/2002 Draughn Sand & Gravel Inc 4.00 1
01/16/2002 03/19/2002 Draughn Sand & Gravel Inc 13.00 1
04/17/2001 04/17/2001 Draughn Sand & Gravel Inc 8.00 1
02/12/2001 02/12/2001 Draughn Sand & Gravel Inc 9.00 1