Braden — Inspections

Total: 5 inspections

Begin End Operator Hours Inspectors
11/13/2025 11/18/2025 River Valley Materials LLC 21.00 1
04/28/2025 05/05/2025 River Valley Materials LLC 8.25 1
10/31/2024 11/06/2024 River Valley Materials LLC 16.50 1
05/28/2024 06/07/2024 River Valley Materials LLC 26.00 1
11/21/2023 11/30/2023 River Valley Materials LLC 31.00 2