Branchdale Job — Inspections

Total: 9 inspections

Begin End Operator Hours Inspectors
01/18/2011 01/27/2011 Post Mining 14.50 1
08/09/2010 08/20/2010 Post Mining 26.00 1
08/06/2010 08/06/2010 Post Mining 5.00 1
02/12/2010 03/17/2010 Post Mining 26.00 1
06/15/2009 09/02/2009 Post Mining 21.50 1
01/30/2009 03/28/2009 Post Mining 21.00 1
09/09/2008 09/21/2008 Post Mining 9.00 1
03/10/2008 03/27/2008 Post Mining 19.00 2
09/05/2007 09/26/2007 Post Mining 35.50 2