Branham & Baker Coal Terminal — Inspections

Total: 115 inspections

Begin End Operator Hours Inspectors
05/06/2002 05/06/2002 Riverway South Inc 12.50 1
04/24/2002 06/06/2002 Riverway South Inc 16.00 1
10/11/2001 12/13/2001 Riverway South Inc 14.00 1
10/09/2001 12/13/2001 Riverway South Inc 22.00 1
05/22/2001 06/07/2001 Riverway South Inc 21.75 1
05/15/2001 05/15/2001 Riverway South Inc 7.50 1
05/15/2001 05/16/2001 Riverway South Inc 16.50 1
03/26/2001 04/10/2001 Riverway South Inc 23.00 1
11/06/2000 11/15/2000 Riverway South Inc 40.00 1
08/17/2000 08/28/2000 Riverway South Inc 9.00 1
08/17/2000 08/17/2000 Riverway South Inc 2.50 1
08/15/2000 08/28/2000 Riverway South Inc 17.00 1
02/03/2000 02/11/2000 Riverway South Inc 11.50 1
02/03/2000 02/11/2000 Riverway South Inc 2.00 1
01/14/2000 02/11/2000 Riverway South Inc 32.50 1