Brex Mobile Plant — Inspections

Total: 4 inspections

Begin End Operator Hours Inspectors
10/15/2025 10/20/2025 Brex Corporation 8.00 1
01/13/2025 01/13/2025 Brex Corporation 8.50 1
10/26/2023 10/27/2023 Brex Corporation 3.25 1
10/19/2023 10/20/2023 Brex Corporation 11.50 1