Bronte Pit — Inspections

Total: 21 inspections

Begin End Operator Hours Inspectors
07/14/2005 07/14/2005 Aim Materials Inc 5.50 1
06/28/2005 06/29/2005 Aim Materials Inc 27.00 1
09/08/2004 09/08/2004 Aim Materials Inc 5.00 1
08/31/2004 09/01/2004 Aim Materials Inc 12.00 1
07/27/2004 07/28/2004 Aim Materials Inc 11.00 1
02/10/2004 02/10/2004 Aim Materials Inc 7.00 1
12/10/2003 12/10/2003 Aim Materials Inc 3.00 1
12/03/2003 12/04/2003 Aim Materials Inc 17.00 1
08/21/2003 08/22/2003 Aim Materials Inc 5.00 1
04/02/2003 04/02/2003 Aim Materials Inc 8.00 1
10/22/2002 10/22/2002 Aim Materials Inc 3.00 1
09/10/2002 09/10/2002 Aim Materials Inc 6.00 1
06/19/2002 06/20/2002 Aim Materials Inc 0.00 0
12/13/2001 12/13/2001 Aim Materials Inc 11.00 1
09/26/2001 09/27/2001 Aim Materials Inc 12.00 1
04/23/2001 04/23/2001 Aim Materials Inc 4.00 1
02/14/2001 02/15/2001 Aim Materials Inc 20.00 2
08/01/2000 08/01/2000 Aim Materials Inc 5.00 1
07/06/2000 07/08/2000 Aim Materials Inc 15.00 1
04/26/2000 04/26/2000 Aim Materials Inc 3.00 1
04/13/2000 04/14/2000 Aim Materials Inc 21.00 1