Brooklyn Wash Plant — Inspections

Total: 11 inspections

Begin End Operator Hours Inspectors
06/12/2025 06/17/2025 Advanced Concrete, Inc 4.25 1
07/31/2024 08/01/2024 Advanced Concrete, Inc 13.00 1
05/31/2023 05/31/2023 Advanced Concrete, Inc 6.50 1
05/31/2022 06/01/2022 Advanced Concrete, Inc 9.00 1
07/13/2021 07/14/2021 Advanced Concrete, Inc 13.50 1
09/08/2020 09/08/2020 Advanced Concrete, Inc 7.00 1
09/02/2020 09/02/2020 Advanced Concrete, Inc 13.50 1
08/20/2019 08/21/2019 Advanced Concrete, Inc 8.25 1
08/08/2018 08/08/2018 Advanced Concrete, Inc 6.75 1
04/25/2017 04/26/2017 Advanced Concrete, Inc 12.25 1
08/31/2016 08/31/2016 Advanced Concrete, Inc 17.00 1