BRP Processing Plant — Inspections

Total: 10 inspections

Begin End Operator Hours Inspectors
07/14/2025 07/14/2025 Crushin It, LLC 10.50 1
01/06/2025 01/07/2025 Crushin It, LLC 12.00 1
05/22/2024 05/22/2024 Crushin It, LLC 3.00 1
05/14/2024 05/15/2024 Crushin It, LLC 19.00 1
12/12/2023 12/13/2023 Crushin It, LLC 9.00 1
09/11/2023 09/14/2023 Crushin It, LLC 0.00 0
09/15/2022 09/15/2022 Crushin It, LLC 5.00 1
09/15/2021 09/16/2021 AG Sand and Gravel LLC 14.50 1
08/31/2020 09/03/2020 AG Sand and Gravel LLC 30.00 1
08/07/2018 08/07/2018 Broken Rock Products, LLC. 8.25 1