Buckeye Surface Mine — Inspections

Total: 9 inspections

Begin End Operator Hours Inspectors
01/14/2003 01/14/2003 Ranger Contracting 3.00 1
10/09/2002 10/09/2002 Ranger Contracting 2.00 1
08/07/2002 08/07/2002 Ranger Contracting 8.00 1
02/14/2002 02/14/2002 Ranger Contracting 4.00 1
02/14/2002 02/14/2002 Ranger Contracting 2.00 1
09/26/2001 09/26/2001 Ranger Contracting 5.00 1
09/04/2001 09/13/2001 Ranger Contracting 11.00 1
09/04/2001 09/06/2001 Ranger Contracting 8.00 1
06/07/2001 06/07/2001 Ranger Contracting 2.00 1