Buncomb Job — Inspections

Total: 3 inspections

Begin End Operator Hours Inspectors
07/23/2008 07/23/2008 Ikerd Mining LLC 5.50 1
01/09/2008 01/31/2008 Ikerd Mining LLC 48.50 2
08/30/2007 09/25/2007 Ikerd Mining LLC 28.00 1