BURLINGTON PLANT — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
10/09/2001 10/11/2001 Luck Stone Corp. 29.00 1
04/23/2001 04/24/2001 Luck Stone Corp. 20.00 1
11/27/2000 11/28/2000 Luck Stone Corp. 21.00 1
05/30/2000 06/01/2000 Luck Stone Corp. 32.00 1
05/25/2000 05/25/2000 Luck Stone Corp. 8.00 1
04/10/2000 04/11/2000 Luck Stone Corp. 22.00 1