C-12 Extec — Inspections

Total: 22 inspections

Begin End Operator Hours Inspectors
05/12/2015 05/13/2015 Fitzpatrick Excavating 5.00 1
07/21/2014 07/21/2014 Fitzpatrick Excavating 4.50 1
05/05/2014 05/05/2014 Fitzpatrick Excavating 3.00 1
06/04/2013 06/04/2013 Fitzpatrick Excavating 3.75 1
05/30/2013 05/30/2013 Fitzpatrick Excavating 3.00 1
05/23/2013 05/23/2013 Fitzpatrick Excavating 5.50 1
05/14/2013 05/15/2013 Fitzpatrick Excavating 16.00 1
12/17/2012 12/17/2012 Fitzpatrick Excavating 0.75 1
10/12/2011 10/12/2011 Fitzpatrick Excavating 7.25 1
10/03/2011 10/06/2011 Fitzpatrick Excavating 17.75 1
09/29/2010 10/19/2010 Fitzpatrick Excavating 4.75 1
04/28/2010 04/28/2010 Fitzpatrick Excavating 1.00 1
10/20/2009 10/20/2009 Fitzpatrick Excavating 1.75 1
06/17/2009 06/20/2009 Fitzpatrick Excavating 8.75 1
06/09/2009 06/09/2009 Fitzpatrick Excavating 10.00 1
08/20/2008 08/21/2008 Fitzpatrick Excavating 6.50 1
08/14/2003 08/18/2003 Fitzpatrick Excavating 6.00 2
05/22/2002 05/22/2002 Fitzpatrick Excavating 3.00 1
11/15/2000 11/22/2000 Fitzpatrick Excavating 27.00 1
10/10/2000 10/13/2000 Fitzpatrick Excavating 10.00 1
10/03/2000 10/05/2000 Fitzpatrick Excavating 23.00 1
08/29/2000 08/30/2000 Fitzpatrick Excavating 4.00 1