Camp Creek Mine No. 1 — Inspections

Total: 87 inspections

Begin End Operator Hours Inspectors
04/23/2002 06/26/2002 Mason Mining, LLC 87.00 3
04/21/2002 04/24/2002 Mason Mining, LLC 8.00 1
03/12/2002 03/13/2002 Bar-K Inc 5.00 1
01/02/2002 03/28/2002 Bar-K Inc 64.50 3
01/02/2002 03/28/2002 Bar-K Inc 5.50 1
10/05/2001 10/05/2001 Bar-K Inc 15.00 1
10/02/2001 12/20/2001 Bar-K Inc 74.00 1
10/02/2001 12/20/2001 Bar-K Inc 78.50 4
10/01/2001 10/02/2001 Bar-K Inc 9.00 1
08/06/2001 08/22/2001 Bar-K Inc 17.25 1
07/02/2001 09/28/2001 Bar-K Inc 203.00 1
06/27/2001 09/24/2001 Bar-K Inc 26.00 1
05/07/2001 05/07/2001 Bar-K Inc 6.00 1
04/17/2001 04/26/2001 Bar-K Inc 12.50 1
04/04/2001 04/09/2001 Bar-K Inc 8.00 1
04/03/2001 06/28/2001 Bar-K Inc 196.00 3
03/21/2001 03/23/2001 Bar-K Inc 17.00 1
01/02/2001 03/30/2001 Bar-K Inc 56.00 1
01/02/2001 03/30/2001 Bar-K Inc 128.00 2
11/16/2000 11/16/2000 Bar-K Inc 8.00 1
10/19/2000 10/23/2000 Bar-K Inc 8.00 1
10/02/2000 12/27/2000 Bar-K Inc 129.50 1
09/28/2000 12/27/2000 Bar-K Inc 74.00 2
09/19/2000 09/19/2000 Bar-K Inc 6.00 1
08/28/2000 09/20/2000 Bar-K Inc 9.50 1
07/11/2000 07/11/2000 Bar-K Inc 8.00 1
06/27/2000 06/27/2000 Bar-K Inc 9.00 1
06/22/2000 08/25/2000 Bar-K Inc 161.50 2
05/12/2000 05/15/2000 Bar-K Inc 5.00 1
05/12/2000 05/15/2000 Bar-K Inc 6.50 2
04/19/2000 05/16/2000 Bar-K Inc 12.50 1
03/31/2000 06/06/2000 Bar-K Inc 189.00 3
03/13/2000 03/15/2000 Bar-K Inc 11.00 1
02/29/2000 03/01/2000 Bar-K Inc 15.00 1
01/24/2000 01/25/2000 Bar-K Inc 15.00 1
01/03/2000 03/08/2000 Bar-K Inc 30.00 1
01/03/2000 03/08/2000 Bar-K Inc 134.00 2