Cantera La Rita — Inspections

Total: 20 inspections

Begin End Operator Hours Inspectors
03/06/2015 03/06/2015 Consorcio Las Lomas 5.75 1
03/06/2015 03/06/2015 Consorcio Las Lomas 0.25 1
07/15/2014 07/15/2014 Consorcio Las Lomas 8.00 1
03/25/2014 03/25/2014 Consorcio Las Lomas 2.50 1
02/26/2014 02/26/2014 Consorcio Las Lomas 6.25 1
04/16/2013 04/16/2013 Consorcio Las Lomas 9.00 1
10/02/2012 10/03/2012 Consorcio Las Lomas 12.50 1
07/17/2012 07/17/2012 Consorcio Las Lomas 8.00 1
02/22/2012 02/22/2012 Consorcio Las Lomas 3.00 1
02/15/2012 02/15/2012 Consorcio Las Lomas 9.00 1
06/08/2011 06/09/2011 Consorcio Las Lomas 13.50 1
06/07/2011 06/07/2011 Consorcio Las Lomas 1.50 1
01/25/2011 01/25/2011 Consorcio Las Lomas 8.00 1
06/07/2010 06/11/2010 Consorcio Las Lomas 11.00 1
02/10/2010 02/10/2010 Consorcio Las Lomas 12.00 1
01/12/2010 01/13/2010 Consorcio Las Lomas 8.50 1
06/16/2009 06/16/2009 Consorcio Las Lomas 8.50 1
03/18/2009 03/19/2009 Consorcio Las Lomas 14.50 1
09/08/2008 09/08/2008 Consorcio Las Lomas 9.00 1
02/14/2008 02/14/2008 Consorcio Las Lomas 5.00 1