Canyon Concrete No 2231 — Inspections

Total: 13 inspections

Begin End Operator Hours Inspectors
03/10/2009 03/10/2009 Canyon Redi-Mix 3.00 1
03/03/2009 03/04/2009 Canyon Redi-Mix 11.75 1
06/24/2008 06/24/2008 Canyon Redi-Mix 12.00 1
12/13/2006 12/13/2006 Canyon Redi-Mix 14.00 1
07/13/2006 07/13/2006 Canyon Redi-Mix 13.25 1
08/23/2005 08/23/2005 Canyon Concrete 2.25 1
08/01/2005 08/02/2005 Canyon Concrete 10.75 1
04/20/2004 04/20/2004 Canyon Concrete 5.00 1
03/30/2004 03/30/2004 Canyon Concrete 11.00 1
12/04/2002 12/04/2002 Canyon Concrete 5.00 1
11/20/2002 11/21/2002 Canyon Concrete 19.00 1
06/27/2002 06/27/2002 Canyon Concrete 7.00 1
05/07/2002 05/10/2002 Canyon Concrete 21.00 1