Caretta #3 Mine — Inspections
Total: 106 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 04/05/2011 | 06/30/2011 | RS Mining Inc | 60.75 | 3 |
| 03/01/2011 | 03/08/2011 | RS Mining Inc | 56.50 | 1 |
| 11/18/2010 | 12/30/2010 | RS Mining Inc | 38.00 | 1 |
| 07/12/2010 | 07/12/2010 | WA Mining, Inc. | 20.00 | 2 |
| 02/25/2009 | 03/10/2009 | WA Mining, Inc. | 9.00 | 1 |
| 08/18/2008 | 11/25/2008 | WA Mining, Inc. | 13.00 | 1 |